Concrete Coating Process

Our concrete coating process starts when you contact us for your free estimate. We then set up an appointment to come to your home or business at your convenience. At that appointment, we will look at the project and prepare an estimate.

1. Schedule

Once you accept and sign the estimate, we will contact you to schedule your project. Our install schedule is usually less than four weeks out. Before our arrival, you will need to empty your garage or business to prepare for its transformation.

2. Prepare the Concrete

All coatings require proper preparation of the concrete. Residential, commercial, and exterior floor surfaces get the same treatment. The floors are ground to a finish that not only cleans the concrete but opens the pores of the concrete to promote proper adhesion of the coating. We use state of the art grinding equipment to prepare the concrete along with a high-powered dustless vacuum that is 97% HEPA dust free. All the dust is contained and disposed. Any cracks, spalling, pitted concrete will then be repaired.

3. Applying the primer/base coat

If you have chosen a coating system that uses Decorative Flake to create the decorative finish, we will broadcast them across the surface by hand.

Once the flakes have cured into the basecoat, we use commercial floor scrapers both ways on the floor to dislodge and remove any excess flakes.

4. Applying the Topcoat

Finally, we apply the topcoat that protects your floor from chemicals, weathering, and yellowing, all while giving it a showroom floor finish.

5. When We Leave

We will leave your home, business, or outdoor space clean. We treat our customers and their property with respect.